Boston Public Library - Orient Heights Branch
East Boston, Massachusetts
Repairs to this neighborhood branch of the Boston Public Library built in 1967.
The scope of work included: Roof Repair, Design of a new exterior egress canopy with associated canopy details, Design of a condensing unit pad and location with new Mechanical / Electrical / Plumbing connections, New Fire Rated Acoustical Ceiling System with replacement lighting fixtures, and new fire rated gypsum soffits.
Project Architect: Charles Bradley III (as an employee of Primary Group, Inc.)
260 BLUE HILLS PARKWAY, MILTON, MASSACHUSETTS 02186
TEL: 617.296.ARCH FAX: 617.296.3633